Skip to content
15% off epoxy floors booked by Dec 31.*Claim 15% Off
ES

Commercial Floors

Using the Holiday Shutdown to Redo a Commercial Floor

By Epoxy Veterans November 27, 2026 4 min read

Steel shop building after: grey flake epoxy floor with a gloss topcoat

For a lot of businesses in Palm Beach County, the stretch between Christmas and New Year is the quietest week of the year. Body shops, warehouses, small manufacturers, showrooms and offices often close for a few days or run with a skeleton crew. That makes it one of the few times you can take a floor out of service without losing a busy week of work.

If your shop floor is stained, chipped or peeling, the holiday shutdown is worth planning around now. Here is what to think about so the floor is done properly and your team walks back in to a finished space in January.

Why the holiday week works for floor work

A commercial floor coating needs an empty room. Equipment, racks and inventory have to move, the slab has to be ground, repaired and coated, and then the floor needs time to cure before it sees traffic. Doing that during a normal week means shutting down part of the operation. During a planned closure, the floor work fits into time you were already losing.

The weather helps too. South Florida's dry season runs roughly from November to April, so late December usually brings lower humidity and fewer afternoon storms than the summer months. Coatings still need the right conditions, and we check them on the day, but a dry stretch makes the job easier to schedule.

Start planning before the shutdown, not during it

The most common reason a holiday floor project slips is that planning starts too late. Many businesses want the same quiet window, so book a quote early and use the time before the closure to get ready.

  1. Get a free on-site quote. We measure the space, test the slab for moisture, show you samples and give you a written quote. That tells you what the floor needs before you commit to dates.
  2. Decide what has to move. Racks, workbenches, lifts and machines on the floor all need a plan. Bolted equipment may need a contractor or your own maintenance staff to unbolt it.
  3. Pick the system for the use. A shop with rolling carts, chemicals and dropped tools needs a different build than a quiet office or showroom. Our commercial epoxy flooring page covers the main options.
  4. Plan the restart. Ask for the cure times for your system and decide when foot traffic, carts and heavy equipment can come back. Light foot traffic returns before heavy wheels.
  5. Tell your team and customers. A short notice about the closure dates keeps deliveries and drop-offs from showing up mid-project.

What happens to the slab during the job

A commercial floor lasts or fails on its preparation. On every job we follow the same steps:

  • Diamond grinding. We grind the concrete instead of acid etching it. Grinding removes old coatings, oil-soaked surface and weak concrete, and leaves an open profile the coating can grip.
  • Crack and spall repair. Cracks and chipped areas are filled and ground flush so the coating sits on a sound, level surface. Our article on crack repair before epoxy explains why this matters.
  • Moisture testing. Every slab is tested. When the readings call for it, a vapor barrier goes down first. Many South Florida slabs sit close to a high water table, and moisture coming up through the concrete is a common reason coatings lift. More on that in why moisture testing matters.
  • Coating and topcoat. The base coat, any flake or color, and the topcoat go down in the order the system calls for, with the cure time each layer needs.

Rushing any of these steps to squeeze the job into a short window is how floors fail. If the closure is too short for the full system your space needs, we would rather tell you that at the quote and work out a sectioned plan than cut corners.

Floors that suit a year-end refresh

Most holiday projects we quote fall into a few groups:

  • Shop and warehouse floors that have taken a year of oil, tire marks and dropped parts. A flake system with a hard topcoat is easy to sweep and hides small marks.
  • Showrooms and customer areas that need to look sharp for the new year. Metallic epoxy gives a glossy, one-of-a-kind finish in spaces that do not see heavy equipment.
  • Outdoor entries and walkways around the building, where an outdoor polyaspartic coating handles sun and rain better than standard epoxy.

You can see finished shop, hangar and garage floors in our gallery. Once the new floor is in, our commercial floor maintenance checklist shows how to keep it in good shape through the year.

Year-end offer

Through December 31, 2026, epoxy floors booked by that date are 15% off. The offer cannot be combined with other offers. Details are on the offer page.

Get a quote before the calendar fills

We serve businesses across Palm Beach County, from Jupiter and Palm Beach Gardens to West Palm Beach, Boynton Beach, Delray Beach and Boca Raton. See the full list on our service areas page.

To get a free on-site quote for your shop, warehouse or showroom, send us a message or call (561) 755-8885. We will measure, test the slab and give you a written quote so you can plan your shutdown with real numbers.

Planning a floor?

Free on-site quote with moisture testing and real samples, anywhere in Palm Beach County.

Free on-site quote

Ready for a flawless finish?

Tell us about the space. We'll visit, moisture-test the slab, show you samples and give you a written quote. No obligation.

  • Written, itemized quote
  • Moisture test on every slab
  • 5-Year Warranty on materials & workmanship

Request your free quote

We reply within one business day.

Or call (561) 755-8885

(561) 755-8885